Home

The boulder has finally been brought to ECA and now awaits install.

IMG_2895

The boulder was tethered to enable transportation with minimal damage.

IMG_2928

Aligning the centre of gravity before the boulder is lowered onto the load distribution frame.

IMG_2934

The boulder is tethered to the support structure using ratchets

IMG_2937

The boulder is lifted onto a trailer before being transported from Strathmore to Edinburgh.

Many thanks to John Easson for his skilled handling of the JCB.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s